ITAC Assessment: MA0623
ITAC logo
ITAC Assessment: MA0623
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Silicone and metal products
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 30,000
ft2
Annual Production 96,000
pieces
Production Hrs. Annual 2,730
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,340 1,084,320
kWh
Electricity Demand $39,006 4,224
kW-mo/yr
Electricity Fees $8,085 -
Natural Gas $24,816 1,616
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,151 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,940

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,848 $117,000 $13,268
105,300
kWh
$7,476
-
kW-mo/yr
$(-6,896.0)
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,363 $50,282 $4,813
38,200
kWh
$1,550
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $6,297 $1,184 - - $6,297
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $643 $460 $643
5,100
kWh
- -
TOTAL RECOMMENDED $27,151 $168,926 $18,724
148,600
kWh
$9,026
-
kW-mo/yr
$(-599.0)
-
MMBtu
TOTAL IMPLEMENTED $6,940 $1,644 $643
5,100
kWh
- $6,297
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs