ITAC Assessment: MA0313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product prestressed concrete
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 282,000
ft2
Annual Production 51,000
thousand feet
Production Hrs. Annual 3,744
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,358 677,608
kWh
Natural Gas $53,595 6,987
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $145,052 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $81,971

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.1333: Convert combustion equipment to burn oil $16,573 $31,939 - $16,573
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,198 $30,000 $12,198
124,560
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,706 $2,248 $9,706
99,062
kWh
- -
04 2.4131: Size electric motors for peak operating efficiency $9,203 $28,535 $9,203
351,700
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,374 $180 $2,374
26,084
kWh
- -
06 3.1191: Change procedures / equipment / operating conditions $69,505 $30,000 - - $69,505
-
lb
07 3.5314: Use in-process recycling whenever possible $25,107 $30,000 - - $25,107
-
lb
08 3.7214: Reduce or eliminate waste $386 $500 - - $386
-
lb
TOTAL RECOMMENDED $145,052 $153,402 $33,481
601,406
kWh
$16,573
-
MMBtu
$94,998
-
lb
TOTAL IMPLEMENTED $81,971 $32,928 $12,080
125,146
kWh
- $69,891
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs