| Assessment Year | 1994 |
|---|---|
| Principal Product | prestressed concrete |
| NAICS |
n/a
|
| SIC | 3272: Concrete Products, Except Block and Brick |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
282,000
ft2
|
| Annual Production | 51,000
thousand feet
|
| Production Hrs. Annual | 3,744
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $66,358 | 677,608 |
kWh
|
$0.098 |
| Natural Gas | $53,595 | 6,987 |
MMBtu
|
$7.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $145,052 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $81,971 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1333: Convert combustion equipment to burn oil | $16,573 | $31,939 | - |
$16,573
-
MMBtu
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,198 | $30,000 |
$12,198
124,560
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,706 | $2,248 |
$9,706
99,062
kWh
|
- | - | |
| 04 | 2.4131: Size electric motors for peak operating efficiency | $9,203 | $28,535 |
$9,203
351,700
kWh
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,374 | $180 |
$2,374
26,084
kWh
|
- | - | |
| 06 | 3.1191: Change procedures / equipment / operating conditions | $69,505 | $30,000 | - | - |
$69,505
-
lb
|
|
| 07 | 3.5314: Use in-process recycling whenever possible | $25,107 | $30,000 | - | - |
$25,107
-
lb
|
|
| 08 | 3.7214: Reduce or eliminate waste | $386 | $500 | - | - |
$386
-
lb
|
|
| TOTAL RECOMMENDED | $145,052 | $153,402 |
$33,481
601,406
kWh
|
$16,573
-
MMBtu
|
$94,998
-
lb
|
||
| TOTAL IMPLEMENTED | $81,971 | $32,928 |
$12,080
125,146
kWh
|
- |
$69,891
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs