Assessment Year | 1994 |
---|---|
Principal Product | nameplates |
NAICS |
n/a
|
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 120 |
Plant Area |
136,941
ft2
|
Annual Production | 15,000
pieces
|
Production Hrs. Annual | 2,275
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $64,615 | 725,381 |
kWh
|
$0.089 |
Natural Gas | $47,906 | 7,082 |
MMBtu
|
$6.76 |
Fuel Oil #2 | $1,506 | 308 |
MMBtu
|
$4.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,732 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,783 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $14,799 | $2,827 |
$14,799
166,178
kWh
|
- | - | - | |
02 | 2.5113: Use direct flame impingement or infrared processing for chamber type heating | $4,017 | $80,000 | - |
$4,017
-
MMBtu
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $1,870 | $6,854 | - |
$1,870
-
MMBtu
|
- | - | |
04 | 2.4131: Size electric motors for peak operating efficiency | $372 | $1,094 |
$372
4,103
kWh
|
- | - | - | |
05 | 3.6112: Use filter and drying oven to reduce sludge volume | $3,394 | $35,728 | - | - |
$3,394
-
gal
|
- | |
06 | 3.5217: Reuse / recycle/ sell paper products | $2,280 | $700 | - | - | - |
$2,280
-
lb
|
|
TOTAL RECOMMENDED | $26,732 | $127,203 |
$15,171
170,281
kWh
|
$5,887
-
MMBtu
|
$3,394
-
gal
|
$2,280
-
lb
|
||
TOTAL IMPLEMENTED | $7,783 | $116,822 |
$372
4,103
kWh
|
$4,017
-
MMBtu
|
$3,394
-
gal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs