ITAC Assessment: MA0291
ITAC logo
ITAC Assessment: MA0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product High Pressure Valves
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 28,500
ft2
Annual Production 0
units
Production Hrs. Annual 4,420
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,182 864,596
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,672

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,823 $6,000 $2,870
28,136
kWh
$(-1,047.0)
-
MMBtu
02 2.7221: Lower temperature during the winter season and vice-versa $3,457 $1,072 $3,457
33,998
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,086 - $1,086
12,309
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $586 - $586
5,862
kWh
-
TOTAL RECOMMENDED $6,952 $7,072 $7,999
80,305
kWh
$(-1,047.0)
-
MMBtu
TOTAL IMPLEMENTED $1,672 - $1,672
18,171
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs