ITAC Assessment: MA0290
ITAC logo
ITAC Assessment: MA0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Optical filters and Coat
NAICS
n/a
SIC 3826: Laboratory Analytical Instruments
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area 27,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,368
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,996 648,007
kWh
Coal $2,501 348
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,768 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Coal Savings Personnel Changes Savings Water Consumption Savings
01 3.4115: Recover and reuse cooling water $12,463 $15,645 $(-676.0)
(-6,741)
kWh
- - - $13,139
-
Tgal
02 2.1333: Convert combustion equipment to burn oil $6,283 $6,250 - $(-1,678.0)
-
MMBtu
$2,501
-
MMBtu
$5,460 -
03 2.2443: Re-use or recycle hot or cold process exhaust air $1,851 $1,190 $1,851
18,464
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,146 $3,034 $1,146
11,430
kWh
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,025 $110 $1,025
12,016
kWh
- - - -
TOTAL RECOMMENDED $22,768 $26,229 $3,346
35,169
kWh
$(-1,678.0)
-
MMBtu
$2,501
-
MMBtu
$5,460 $13,139
-
Tgal
TOTAL IMPLEMENTED $22,768 $26,229 $3,346
35,169
kWh
$(-1,678.0)
-
MMBtu
$2,501
-
MMBtu
$5,460 $13,139
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs