ITAC Assessment: MA0284
ITAC logo
ITAC Assessment: MA0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product custom molded plastic pa
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area 18,000
ft2
Annual Production 350,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,407 181,125
kWh
Natural Gas $2,716 249
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,804 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $847

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $689 $685 - $689
-
MMBtu
02 2.7131: Add area lighting switches $761 $600 $761
6,155
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $725 $1,095 $725
5,862
kWh
-
04 2.2511: Insulate bare equipment $290 $234 $290
2,345
kWh
-
05 2.6218: Turn off equipment when not in use $158 - $158
2,638
kWh
-
06 2.7135: Install occupancy sensors $181 $218 $181
1,465
kWh
-
TOTAL RECOMMENDED $2,804 $2,832 $2,115
18,465
kWh
$689
-
MMBtu
TOTAL IMPLEMENTED $847 $685 $158
2,638
kWh
$689
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs