ITAC Assessment: MA0268
ITAC logo
ITAC Assessment: MA0268
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Polyurethane film,sheet
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 50,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 6,320
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $324,519 3,813,013
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 3.4115: Recover and reuse cooling water $27,923 $65,033 $27,923
169,988
kWh
-
02 2.7241: Install outside air damper / economizer on hvac unit $4,788 $6,000 $4,788
56,272
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,611 $13,957 $11,223
131,887
kWh
$(-3,612.0)
-
MMBtu
04 2.2443: Re-use or recycle hot or cold process exhaust air $823 $97 $823
9,672
kWh
-
05 2.3191: Use demand controller or load shedder $2,138 - $2,138
-
kWh
-
06 2.3191: Use demand controller or load shedder $1,927 - $1,927
-
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,666 $30,813 $3,666
43,083
kWh
-
TOTAL RECOMMENDED $48,876 $115,900 $52,488
410,902
kWh
$(-3,612.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs