Assessment Year | 1993 |
---|---|
Principal Product | Polyethylene tubing |
NAICS |
n/a
|
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
25,000
ft2
|
Annual Production | 16,000,000
lb
|
Production Hrs. Annual | 8,688
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $347,633 | 4,349,648 |
kWh
|
$0.080 |
LPG | $5,107 | 695 |
MMBtu
|
$7.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,123 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,628 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
---|---|---|---|---|---|---|
01 | 2.5121: Redesign flow to minimize mass transfer length | $5,832 | $301 |
$5,832
72,978
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,246 | $4,899 |
$5,246
65,651
kWh
|
- | |
03 | 2.2511: Insulate bare equipment | $2,483 | $250 |
$2,483
31,067
kWh
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $2,483 | - |
$2,483
31,067
kWh
|
- | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,235 | $4,181 |
$1,897
23,740
kWh
|
$(-662.0)
-
MMBtu
|
|
06 | 2.4314: Use synthetic lubricant | $1,241 | - |
$1,241
15,533
kWh
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $913 | - |
$913
11,430
kWh
|
- | |
08 | 2.4311: Recover mechanical energy | $913 | - |
$913
11,430
kWh
|
- | |
09 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $777 | - |
$1,218
15,240
kWh
|
$(-441.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $21,123 | $9,631 |
$22,226
278,136
kWh
|
$(-1,103.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $16,628 | $5,450 |
$16,628
208,089
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs