ITAC Assessment: MA0265
ITAC logo
ITAC Assessment: MA0265
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Fish Fillets
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 36,608
ft2
Annual Production 1,300,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,747 1,728,312
kWh
LPG $42,754 5,251
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,679 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,063

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #2 Savings
01 2.2514: Cover open tanks $7,538 $5,000 - $7,538
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,788 $12,305 $7,788
120,457
kWh
- -
03 2.2437: Recover waste heat from equipment $3,525 $12,420 $3,525
54,513
kWh
- -
04 2.7135: Install occupancy sensors $114 $85 $114
1,758
kWh
- -
05 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $49,714 $17,787 $180,337
2,076,202
kWh
$37,582
-
MMBtu
$(-168,205.0)
-
MMBtu
TOTAL RECOMMENDED $68,679 $47,597 $191,764
2,252,930
kWh
$45,120
-
MMBtu
$(-168,205.0)
-
MMBtu
TOTAL IMPLEMENTED $11,063 $17,420 $3,525
54,513
kWh
$7,538
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs