ITAC Assessment: MA0262
ITAC logo
ITAC Assessment: MA0262
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Radar Domes
NAICS
n/a
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $5
M
to 10
M
# of Employees 68
Plant Area 72,000
ft2
Annual Production 90
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,742 1,286,342
kWh
LPG $1,498 155
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,750 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,401

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,141 $36,577 $11,141
77,960
kWh
-
02 2.1332: Convert combustion equipment to burn natural gas $3,538 $14,000 $4,020
28,136
kWh
$(-482.0)
-
MMBtu
03 2.6218: Turn off equipment when not in use $2,401 $400 $2,401
105,803
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $670 - $670
4,689
kWh
-
TOTAL RECOMMENDED $17,750 $50,977 $18,232
216,588
kWh
$(-482.0)
-
MMBtu
TOTAL IMPLEMENTED $2,401 $400 $2,401
105,803
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs