ITAC Assessment: MA0250
ITAC logo
ITAC Assessment: MA0250
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ALUMINUM/ZINC DIE CASTS
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $5
M
to 10
M
# of Employees 106
Plant Area
n/a
Annual Production 3,000,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,781 2,646,542
kWh
Natural Gas $378,222 58,954
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $223,755 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $157,407 $100,000 - $157,407
-
MMBtu
02 2.4239: Eliminate or reduce compressed air usage $39,404 $1,280 $39,404
364,889
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,414 $25,738 $15,414
142,732
kWh
-
04 2.2514: Cover open tanks $10,241 $2,000 - $10,241
-
MMBtu
05 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $1,289 - $(-2,026.0)
(-18,757)
kWh
$3,315
-
MMBtu
TOTAL RECOMMENDED $223,755 $129,018 $52,792
488,864
kWh
$170,963
-
MMBtu
TOTAL IMPLEMENTED $40,693 $1,280 $37,378
346,132
kWh
$3,315
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs