ITAC Assessment: MA0211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product INDUSTRIAL DIAMOND TOOLS
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,750
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,785 653,869
kWh
LPG $8,542 733
MMBtu
Fuel Oil #2 $13,006 1,665
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,131 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,131

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,111 - $20,436
203,107
kWh
$(-11,325.0)
-
MMBtu
02 2.7226: Use computer programs to optimize hvac performance $7,689 $3,548 $6,163
61,254
kWh
$1,526
-
MMBtu
03 2.2614: Use cooling tower or economizer to replace chiller cooling $2,122 $8,554 $2,122
21,981
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $796 $400 $796
7,913
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $413 $322 $413
4,103
kWh
-
TOTAL RECOMMENDED $20,131 $12,824 $29,930
298,358
kWh
$(-9,799.0)
-
MMBtu
TOTAL IMPLEMENTED $20,131 $12,824 $29,930
298,358
kWh
$(-9,799.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs