Assessment Year | 1991 |
---|---|
Principal Product | INDUSTRIAL DIAMOND TOOLS |
NAICS |
n/a
|
SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,750
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $65,785 | 653,869 |
kWh
|
$0.10 |
LPG | $8,542 | 733 |
MMBtu
|
$11.65 |
Fuel Oil #2 | $13,006 | 1,665 |
MMBtu
|
$7.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,131 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,131 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $9,111 | - |
$20,436
203,107
kWh
|
$(-11,325.0)
-
MMBtu
|
|
02 | 2.7226: Use computer programs to optimize hvac performance | $7,689 | $3,548 |
$6,163
61,254
kWh
|
$1,526
-
MMBtu
|
|
03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,122 | $8,554 |
$2,122
21,981
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $796 | $400 |
$796
7,913
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $413 | $322 |
$413
4,103
kWh
|
- | |
TOTAL RECOMMENDED | $20,131 | $12,824 |
$29,930
298,358
kWh
|
$(-9,799.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $20,131 | $12,824 |
$29,930
298,358
kWh
|
$(-9,799.0)
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs