ITAC Assessment: MA0191
ITAC logo
ITAC Assessment: MA0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product GRANULATORS & SHREDDERS
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 114
Plant Area
n/a
Annual Production 1,980,000
lb
Production Hrs. Annual 2,470
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,483 1,168,230
kWh
Natural Gas $26,569 4,242
MMBtu
Fuel Oil #2 $8,495 1,532
MMBtu
Fuel Oil #4 $10,862 2,362
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,338 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,501

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings Administrative Changes Savings
01 2.2113: Repair or replace steam traps $1,017 $1,992 - - $3,168
-
MMBtu
$(-2,151.0)
02 2.3212: Optimize plant power factor $4,754 $9,230 $4,754
5,862
kWh
- - -
03 2.2437: Recover waste heat from equipment $1,162 $476 $1,205
56,565
kWh
$(-43.0)
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,066 $4,648 $7,066
85,580
kWh
- - -
05 2.7229: Air condition only space necessary $7,339 $3,720 - - $7,339
-
MMBtu
-
TOTAL RECOMMENDED $21,338 $20,066 $13,025
148,007
kWh
$(-43.0)
-
MMBtu
$10,507
-
MMBtu
$(-2,151.0)
TOTAL IMPLEMENTED $8,501 $4,196 $1,205
56,565
kWh
$(-43.0)
-
MMBtu
$7,339
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs