ITAC Assessment: MA0190
ITAC logo
ITAC Assessment: MA0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product SINTERED POWDERED METAL
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 28
Plant Area
n/a
Annual Production 988,228
lb
Production Hrs. Annual 6,120
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,990 438,746
kWh
Natural Gas $53,736 9,059
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,117 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,050

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,902 $800 $1,902
22,567
kWh
-
02 2.4133: Use most efficient type of electric motors $303 $909 $303
3,517
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $540 - $540
6,448
kWh
-
04 2.2443: Re-use or recycle hot or cold process exhaust air $1,764 $7,227 $1,368
16,120
kWh
$396
-
MMBtu
05 2.4322: Use or replace with energy efficient substitutes $27,990 $158,000 - $27,990
-
MMBtu
06 2.7111: Reduce illumination to minimum necessary levels $618 $600 $618
7,327
kWh
-
TOTAL RECOMMENDED $33,117 $167,536 $4,731
55,979
kWh
$28,386
-
MMBtu
TOTAL IMPLEMENTED $31,050 $159,400 $3,060
36,342
kWh
$27,990
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs