ITAC Assessment: MA0181
ITAC logo
ITAC Assessment: MA0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product MEDICAL COTTON PRODUCTS
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 370
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 7,200
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $539,823 7,754,983
kWh
Natural Gas $55,070 14,229
MMBtu
Fuel Oil #2 $9,227 2,100
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,551 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,332

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $3,610 - $3,610
-
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $29,219 - $40,086
575,909
kWh
$(-10,867.0)
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $30,640 $90,296 $30,640
440,211
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $82 $75 $82
1,172
kWh
-
TOTAL RECOMMENDED $63,551 $90,371 $74,418
1,017,292
kWh
$(-10,867.0)
-
MMBtu
TOTAL IMPLEMENTED $34,332 $90,371 $34,332
441,383
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs