ITAC Assessment: MA0172
ITAC logo
ITAC Assessment: MA0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product FORGINGS
NAICS
n/a
SIC 3463: Nonferrous Forgings
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area
n/a
Annual Production 2,000,000
lb
Production Hrs. Annual 3,283
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,783 1,877,784
kWh
Natural Gas $87,272 16,028
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,131 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,131

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $499 $168 $499
5,862
kWh
-
02 2.2531: Re-size charging openings or add movable cover or door $4,911 $2,000 - $4,911
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,721 $326 $792
9,086
kWh
$1,929
-
MMBtu
TOTAL RECOMMENDED $8,131 $2,494 $1,291
14,948
kWh
$6,840
-
MMBtu
TOTAL IMPLEMENTED $8,131 $2,494 $1,291
14,948
kWh
$6,840
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs