ITAC Assessment: MA0163
ITAC logo
ITAC Assessment: MA0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product EXTRUDED POLYMERS
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $1
M
to 5
M
# of Employees 32
Plant Area
n/a
Annual Production 1,950,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,553 2,072,685
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,281 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,871

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,444 $285 $1,444
18,171
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,427 - $1,427
17,878
kWh
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,670 - $4,670
-
kWh
-
04 2.3212: Optimize plant power factor $9,247 $7,253 $9,247
12,309
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,890 $4,255 $5,227
65,064
kWh
$(-2,337.0)
-
MMBtu
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,603 $13,662 $17,368
216,295
kWh
$(-7,765.0)
-
MMBtu
TOTAL RECOMMENDED $29,281 $25,455 $39,383
329,717
kWh
$(-10,102.0)
-
MMBtu
TOTAL IMPLEMENTED $2,871 $285 $2,871
36,049
kWh
-