ITAC Assessment: MA0159
ITAC logo
ITAC Assessment: MA0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CUSTOM URETHANE PRODUCTS
NAICS
n/a
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 290
Plant Area
n/a
Annual Production 1,800,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $546,575 8,135,111
kWh
LPG $72,234 14,748
MMBtu
Fuel Oil #4 $91,060 25,344
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,510 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,178

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #4 Savings Administrative Changes Savings
01 2.2532: Use only amount of air necessary to prevent explosion hazard $10,055 $12,760 $4,253
63,306
kWh
$5,802
-
MMBtu
- -
02 2.2531: Re-size charging openings or add movable cover or door $684 $3,027 - - $684
-
MMBtu
-
03 2.2136: Install / repair insulation on steam lines $2,298 $2,700 - - $2,298
-
MMBtu
-
04 2.2122: Install / repair insulation on condensate lines $444 $297 - - $444
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $980 $1,800 - - - $980
06 2.2532: Use only amount of air necessary to prevent explosion hazard $752 - $127
1,758
kWh
$625
-
MMBtu
- -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,297 $2,190 $1,805
26,964
kWh
$(-508.0)
-
MMBtu
- -
TOTAL RECOMMENDED $16,510 $22,774 $6,185
92,028
kWh
$5,919
-
MMBtu
$3,426
-
MMBtu
$980
TOTAL IMPLEMENTED $4,178 $6,024 $127
1,758
kWh
$625
-
MMBtu
$3,426
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Fuel Oil #4 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs