ITAC Assessment: MA0154
ITAC logo
ITAC Assessment: MA0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CASTINGS (ALUMINUM)
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $5
M
to 10
M
# of Employees 114
Plant Area
n/a
Annual Production 792,000
lb
Production Hrs. Annual 4,575
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,301 2,533,705
kWh
LPG $34,309 9,047
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,447

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,565 $12,000 $8,337
109,320
kWh
$(-1,772.0)
-
MMBtu
02 2.2223: Enhance sensitivity of temperature control and cutoff $882 $2,892 $620
8,206
kWh
$262
-
MMBtu
03 2.2443: Re-use or recycle hot or cold process exhaust air $1,186 $4,403 - $1,186
-
MMBtu
04 2.2443: Re-use or recycle hot or cold process exhaust air $24,986 $4,440 $30,105
394,783
kWh
$(-5,119.0)
-
MMBtu
05 2.2511: Insulate bare equipment $395 $757 - $395
-
MMBtu
06 2.2444: Use hot process fluids to preheat incoming process fluids $1,999 $8,160 - $1,999
-
MMBtu
TOTAL RECOMMENDED $36,013 $32,652 $39,062
512,309
kWh
$(-3,049.0)
-
MMBtu
TOTAL IMPLEMENTED $7,447 $14,892 $8,957
117,526
kWh
$(-1,510.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings