ITAC Assessment: MA0147
ITAC logo
ITAC Assessment: MA0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product HIGH PRECISION BEARINGS
NAICS
n/a
SIC 3562: Ball and Roller Bearings
Sales Range $50
M
to 100
M
# of Employees 850
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,600
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $847,928 12,750,879
kWh
Fuel Oil #4 $87,719 24,336
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $196,285 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,670

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings
01 2.2491: Use cooling air which cools hot work pieces for space heating $9,019 $15,500 $5,187
77,960
kWh
$3,832
-
MMBtu
02 2.7233: Use properly designed and sized hvac equipment $182,460 $350,000 $104,934
1,577,960
kWh
$77,526
-
MMBtu
03 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $144 $41 $29
586
kWh
$115
-
MMBtu
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $3,136 $483 - $3,136
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $446 $331 - $446
-
MMBtu
06 2.3191: Use demand controller or load shedder $1,080 - $1,080
-
kWh
-
TOTAL RECOMMENDED $196,285 $366,355 $111,230
1,656,506
kWh
$85,055
-
MMBtu
TOTAL IMPLEMENTED $1,670 $372 $1,109
586
kWh
$561
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs