| Assessment Year | 1989 |
|---|---|
| Principal Product | HIGH PRECISION BEARINGS |
| NAICS |
n/a
|
| SIC | 3562: Ball and Roller Bearings |
| Sales Range | $50 M to 100M |
| # of Employees | 850 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $847,928 | 12,750,879 |
kWh
|
$0.066 |
| Fuel Oil #4 | $87,719 | 24,336 |
MMBtu
|
$3.60 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $196,285 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,670 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #4 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2491: Use cooling air which cools hot work pieces for space heating | $9,019 | $15,500 |
$5,187
77,960
kWh
|
$3,832
-
MMBtu
|
|
| 02 | 2.7233: Use properly designed and sized hvac equipment | $182,460 | $350,000 |
$104,934
1,577,960
kWh
|
$77,526
-
MMBtu
|
|
| 03 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $144 | $41 |
$29
586
kWh
|
$115
-
MMBtu
|
|
| 04 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $3,136 | $483 | - |
$3,136
-
MMBtu
|
|
| 05 | 2.2136: Install / repair insulation on steam lines | $446 | $331 | - |
$446
-
MMBtu
|
|
| 06 | 2.3191: Use demand controller or load shedder | $1,080 | - |
$1,080
-
kWh
|
- | |
| TOTAL RECOMMENDED | $196,285 | $366,355 |
$111,230
1,656,506
kWh
|
$85,055
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $1,670 | $372 |
$1,109
586
kWh
|
$561
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #4 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs