Assessment Year | 1989 |
---|---|
Principal Product | HIGH PRECISION BEARINGS |
NAICS |
n/a
|
SIC | 3562: Ball and Roller Bearings |
Sales Range | $50 M to 100M |
# of Employees | 850 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $847,928 | 12,750,879 |
kWh
|
$0.066 |
Fuel Oil #4 | $87,719 | 24,336 |
MMBtu
|
$3.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $196,285 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,670 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #4 Savings |
---|---|---|---|---|---|---|
01 | 2.2491: Use cooling air which cools hot work pieces for space heating | $9,019 | $15,500 |
$5,187
77,960
kWh
|
$3,832
-
MMBtu
|
|
02 | 2.7233: Use properly designed and sized hvac equipment | $182,460 | $350,000 |
$104,934
1,577,960
kWh
|
$77,526
-
MMBtu
|
|
03 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $144 | $41 |
$29
586
kWh
|
$115
-
MMBtu
|
|
04 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $3,136 | $483 | - |
$3,136
-
MMBtu
|
|
05 | 2.2136: Install / repair insulation on steam lines | $446 | $331 | - |
$446
-
MMBtu
|
|
06 | 2.3191: Use demand controller or load shedder | $1,080 | - |
$1,080
-
kWh
|
- | |
TOTAL RECOMMENDED | $196,285 | $366,355 |
$111,230
1,656,506
kWh
|
$85,055
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,670 | $372 |
$1,109
586
kWh
|
$561
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #4 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs