| Assessment Year | 1988 |
|---|---|
| Principal Product | OPTICAL CHARGE RECOGNITION EQUIPMENT |
| NAICS |
n/a
|
| SIC | 3577: Computer Peripheral Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 155
pieces
|
| Production Hrs. Annual | 2,295
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $80,250 | 1,214,244 |
kWh
|
$0.066 |
| Natural Gas | $10,070 | 1,525 |
MMBtu
|
$6.60 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $13,672 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,085 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $2,450 | $340 |
$2,450
36,928
kWh
|
- | |
| 02 | 2.2443: Re-use or recycle hot or cold process exhaust air | $291 | $2,450 | - |
$291
-
MMBtu
|
|
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $130 | $110 |
$130
2,052
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $790 | $260 |
$(-74.0)
(-1,172)
kWh
|
$864
-
MMBtu
|
|
| 05 | 2.7226: Use computer programs to optimize hvac performance | $5,772 | $10,500 |
$5,772
87,339
kWh
|
- | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $1,506 | $183 |
$1,506
22,860
kWh
|
- | |
| 07 | 2.7226: Use computer programs to optimize hvac performance | $2,733 | $1,700 | - |
$2,733
-
MMBtu
|
|
| TOTAL RECOMMENDED | $13,672 | $15,543 |
$9,784
148,007
kWh
|
$3,888
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,085 | $12,650 |
$8,352
126,319
kWh
|
$2,733
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs