ITAC Assessment: MA0125
ITAC logo
ITAC Assessment: MA0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product TISSUE PAPER
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $5
M
to 10
M
# of Employees 66
Plant Area
n/a
Annual Production 3,500
ton
Production Hrs. Annual 6,000
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,181 2,699,883
kWh
Fuel Oil #6 $135,702 41,952
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $985

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,470 - $1,470
20,516
kWh
-
02 2.2511: Insulate bare equipment $2,156 $1,143 - $2,156
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $985 $201 $985
13,775
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,614 $18,000 $17,614
245,897
kWh
-
TOTAL RECOMMENDED $22,225 $19,344 $20,069
280,188
kWh
$2,156
-
MMBtu
TOTAL IMPLEMENTED $985 $201 $985
13,775
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs