ITAC Assessment: MA0119
ITAC logo
ITAC Assessment: MA0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product WOOD FLAKE BOARD
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area
n/a
Annual Production 100,000
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,119,964 17,303,928
kWh
Fuel Oil #2 $1,062,076 259,280
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $210,904 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Wood Savings
01 2.3212: Optimize plant power factor $21,434 $11,653 $21,434
86,753
kWh
- -
02 2.2437: Recover waste heat from equipment $6,294 $6,575 $(-946.0)
(-14,654)
kWh
$7,240
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $8,620 $10,167 $8,620
82,943
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $17,034 - $17,034
263,775
kWh
- -
05 2.7291: Reschedule and rearrange multiple-source heating systems $72,100 $35,000 - $104,033
-
MMBtu
$(-31,933.0)
-
MMBtu
06 2.2444: Use hot process fluids to preheat incoming process fluids $85,422 $26,275 $(-1,437.0)
(-22,274)
kWh
$86,859
-
MMBtu
-
TOTAL RECOMMENDED $210,904 $89,670 $44,705
396,543
kWh
$198,132
-
MMBtu
$(-31,933.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs