ITAC Assessment: MA0104
ITAC logo
ITAC Assessment: MA0104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product ALUMINUM CANS
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $100
M
to 500
M
# of Employees 187
Plant Area
n/a
Annual Production 967,200,000
pieces
Production Hrs. Annual 8,112
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $945,537 17,507,914
kWh
Natural Gas $396,274 74,656
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,212

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $12,941 - $12,941
240,035
kWh
-
02 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $13,596 $1,900 - $13,596
-
MMBtu
03 2.2443: Re-use or recycle hot or cold process exhaust air $4,988 $9,900 - $4,988
-
MMBtu
04 2.2511: Insulate bare equipment $821 $1,968 - $821
-
MMBtu
05 2.4133: Use most efficient type of electric motors $3,962 $6,000 $3,962
73,271
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $10,321 $1,099 $10,321
191,090
kWh
-
TOTAL RECOMMENDED $46,629 $20,867 $27,224
504,396
kWh
$19,405
-
MMBtu
TOTAL IMPLEMENTED $32,212 $16,999 $27,224
504,396
kWh
$4,988
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs