Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product COMPONENTS FOR ENGINES
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,750
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,332 1,557,444
kWh
LPG $18,894 1,685
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,642 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,224

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings
01 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $766 $500 $766
5,862
kWh
- -
02 2.7221: Lower temperature during the winter season and vice-versa $9,458 $425 - - $9,458
-
MMBtu
03 2.7111: Reduce illumination to minimum necessary levels $28,798 $1,170 $28,798
308,617
kWh
- -
04 2.2511: Insulate bare equipment $908 $192 $908
9,672
kWh
- -
05 2.1331: Burn a less expensive grade of fuel $2,712 $4,805 - $(-3,872.0)
-
MMBtu
$6,584
-
MMBtu
TOTAL RECOMMENDED $42,642 $7,092 $30,472
324,151
kWh
$(-3,872.0)
-
MMBtu
$16,042
-
MMBtu
TOTAL IMPLEMENTED $10,224 $925 $766
5,862
kWh
- $9,458
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs