ITAC Assessment: MA0057
ITAC logo
ITAC Assessment: MA0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product QUALITY HAND TOOLS
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $1
M
to 5
M
# of Employees 31
Plant Area
n/a
Annual Production 400,000
lb
Production Hrs. Annual 2,125
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $11,327 104,045
kWh
Fuel Oil #1 $10,765 1,474
MMBtu
Fuel Oil #2 $14,137 1,876
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,301 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,789

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #1 Savings Fuel Oil #2 Savings
01 2.2414: Use waste heat from hot flue gases to preheat $3,191 $2,500 $3,191
29,308
kWh
- -
02 2.7421: Reduce glazed areas in buildings $3,959 $8,455 - $3,959
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $377 $300 - $377
-
MMBtu
-
04 2.4322: Use or replace with energy efficient substitutes $4,512 - - - $4,512
-
MMBtu
05 2.2428: Use flue gases in radiant heater for space heating, ovens, etc $2,262 $7,500 - $2,262
-
MMBtu
-
TOTAL RECOMMENDED $14,301 $18,755 $3,191
29,308
kWh
$6,598
-
MMBtu
$4,512
-
MMBtu
TOTAL IMPLEMENTED $9,789 $18,755 $3,191
29,308
kWh
$6,598
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs