ITAC Assessment: MA0050
ITAC logo
ITAC Assessment: MA0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product INDUSTRIAL TEFLON
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 250,000
lb
Production Hrs. Annual 4,680
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,753 731,829
kWh
Fuel Oil #2 $9,729 1,302
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,405 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,158

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $16,247 $16,000 $31,307
343,200
kWh
$(-15,060.0)
-
MMBtu
-
02 2.7494: Install storm windows and doors $1,558 $1,600 - - $1,558
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,600 $55 $1,600
17,585
kWh
- -
TOTAL RECOMMENDED $19,405 $17,655 $32,907
360,785
kWh
$(-15,060.0)
-
MMBtu
$1,558
-
MMBtu
TOTAL IMPLEMENTED $3,158 $1,655 $1,600
17,585
kWh
- $1,558
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs