ITAC Assessment: MA0048
ITAC logo
ITAC Assessment: MA0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ICE CREAM
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area
n/a
Annual Production 2,000,000
pieces
Production Hrs. Annual 0
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,970 1,083,529
kWh
Fuel Oil #2 $6,597 977
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,731 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,228

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $592 $180 $592
6,448
kWh
-
02 2.1222: Install turbulators $636 $2,200 - $636
-
MMBtu
03 2.7226: Use computer programs to optimize hvac performance $728 $1,700 - $728
-
MMBtu
04 2.2437: Recover waste heat from equipment $2,960 $2,710 $(-253.0)
(-2,638)
kWh
$3,213
-
MMBtu
05 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $4,082 $2,095 $4,082
44,256
kWh
-
06 2.3191: Use demand controller or load shedder $3,733 $9,000 $3,733
-
kWh
-
TOTAL RECOMMENDED $12,731 $17,885 $8,154
48,066
kWh
$4,577
-
MMBtu
TOTAL IMPLEMENTED $1,228 $2,380 $592
6,448
kWh
$636
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs