ITAC Assessment: MA0046
ITAC logo
ITAC Assessment: MA0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product INJECTION-MOLDED PLASTIC
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 2,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,439 792,497
kWh
Natural Gas $1,847 250
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $738 $1,650 $738
10,258
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $530 $74 $530
7,327
kWh
-
03 2.6212: Turn off equipment during breaks, reduce operating time $3,418 $168 $3,418
48,066
kWh
-
04 2.2444: Use hot process fluids to preheat incoming process fluids $924 $1,350 - $924
-
MMBtu
05 2.3212: Optimize plant power factor $776 $1,875 $776
-
kWh
-
TOTAL RECOMMENDED $6,386 $5,117 $5,462
65,651
kWh
$924
-
MMBtu
TOTAL IMPLEMENTED $530 $74 $530
7,327
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs