ITAC Assessment: MA0029
ITAC logo
ITAC Assessment: MA0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product CORRUG SHIPPING CONTAINERS
NAICS
n/a
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area
n/a
Annual Production 348,000
thousand feet
Production Hrs. Annual 6,732
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,060 1,886,284
kWh
Natural Gas $53,813 10,675
MMBtu
Fuel Oil #4 $14,690 2,419
MMBtu
Fuel Oil #6 $87,779 17,792
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,037 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $344 $94 $344
4,396
kWh
- -
02 2.7245: Use direct air supply to exhaust hoods $17,454 $9,015 - $6,638
-
MMBtu
$10,816
-
MMBtu
03 2.2437: Recover waste heat from equipment $6,980 $268 - $2,651
-
MMBtu
$4,329
-
MMBtu
04 2.6242: Minimize operation of equipment maintained in standby condition $636 $763 - $242
-
MMBtu
$394
-
MMBtu
05 2.5123: Reduce fluid flow rates $2,655 - - $1,008
-
MMBtu
$1,647
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $5,968 $2,000 - $2,268
-
MMBtu
$3,700
-
MMBtu
TOTAL RECOMMENDED $34,037 $12,140 $344
4,396
kWh
$12,807
-
MMBtu
$20,886
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs