ITAC Assessment: MA0022
ITAC logo
ITAC Assessment: MA0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ICE CREAM,KEFIR,EGGNOG
NAICS
n/a
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $1
M
to 5
M
# of Employees 7
Plant Area
n/a
Annual Production 140
Tgal
Production Hrs. Annual 0
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,032 341,735
kWh
Fuel Oil #2 $4,443 601
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,851 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,628

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.2447: Heat water with exhaust heat $2,163 $1,875 $2,163
28,429
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $753 $1,827 $1,293
16,999
kWh
$(-540.0)
-
MMBtu
03 2.1221: Replace obsolete burners with more efficient ones $160 $154 - $160
-
MMBtu
04 2.2444: Use hot process fluids to preheat incoming process fluids $283 - - $283
-
MMBtu
05 2.3212: Optimize plant power factor $432 $289 $432
-
kWh
-
06 2.3191: Use demand controller or load shedder $1,060 $1,190 $1,060
-
kWh
-
TOTAL RECOMMENDED $4,851 $5,335 $4,948
45,428
kWh
$(-97.0)
-
MMBtu
TOTAL IMPLEMENTED $1,628 $2,270 $1,725
16,999
kWh
$(-97.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs