Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product RATCHETS & WRENCHES
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,250
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,169 177,022
kWh
Natural Gas $7,988 1,147
MMBtu
Fuel Oil #2 $10,993 1,400
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,131 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,131

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $466 $200 - - $466
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $106 $165 $106
1,172
kWh
- -
03 2.7224: Reduce space conditioning during non-working hours $3,605 - - $244
-
MMBtu
$3,361
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $954 $114 $954
11,137
kWh
- -
TOTAL RECOMMENDED $5,131 $479 $1,060
12,309
kWh
$244
-
MMBtu
$3,827
-
MMBtu
TOTAL IMPLEMENTED $5,131 $479 $1,060
12,309
kWh
$244
-
MMBtu
$3,827
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs