ITAC Assessment: CO0635
ITAC logo
ITAC Assessment: CO0635
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Semiconductor chemicals
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 75
Plant Area 215,000
ft2
Annual Production 48,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,747 4,506,002
kWh
Electricity Demand $163,678 10,618
kW-mo/yr
Electricity Fees $2,459 -
Natural Gas $140,247 16,466
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,090 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,050

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4323: Use optimum size and capacity equipment $21,490 $12,290 $13,670
366,200
kWh
$7,820
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $1,520 $10,350 $970
25,900
kWh
$550
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,100 $1,510 $1,970
52,700
kWh
$1,130
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,170 $11,190 $5,310
142,400
kWh
$2,910
-
kW-mo/yr
- $190 $760
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,050 $4,130 $140
3,700
kWh
$80
-
kW-mo/yr
- $300 $530
06 2.7243: Improve air circulation with destratification fans / other methods $3,760 $10,240 $(-260.0)
(-7,100)
kWh
$(-160.0)
-
kW-mo/yr
$4,180
-
MMBtu
- -
TOTAL RECOMMENDED $40,090 $49,710 $21,800
583,800
kWh
$12,330
-
kW-mo/yr
$4,180
-
MMBtu
$490 $1,290
TOTAL IMPLEMENTED $1,050 $4,130 $140
3,700
kWh
$80
-
kW-mo/yr
- $300 $530
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs