| Assessment Year | 1984 |
|---|---|
| Principal Product | MARINE CABLES |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 85 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,656
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $32,673 | 373,974 |
kWh
|
$0.087 |
| Natural Gas | $3,860 | 479 |
MMBtu
|
$8.06 |
| Fuel Oil #4 | $1,015 | 1,015 |
MMBtu
|
$1.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $1,540 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,540 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,078 | $100 |
$1,078
12,309
kWh
|
|
| 02 | 2.2511: Insulate bare equipment | $40 | $25 |
$40
586
kWh
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $422 | $550 |
$422
4,982
kWh
|
|
| TOTAL RECOMMENDED | $1,540 | $675 |
$1,540
17,877
kWh
|
||
| TOTAL IMPLEMENTED | $1,540 | $675 |
$1,540
17,877
kWh
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs