ITAC Assessment: MA0012
ITAC logo
ITAC Assessment: MA0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product MARINE CABLES
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,656
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,673 373,974
kWh
Natural Gas $3,860 479
MMBtu
Fuel Oil #4 $1,015 1,015
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,540 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,540

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,078 $100 $1,078
12,309
kWh
02 2.2511: Insulate bare equipment $40 $25 $40
586
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $422 $550 $422
4,982
kWh
TOTAL RECOMMENDED $1,540 $675 $1,540
17,877
kWh
TOTAL IMPLEMENTED $1,540 $675 $1,540
17,877
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs