ITAC Assessment: MA0003
ITAC logo
ITAC Assessment: MA0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product ICE CREAM
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area
n/a
Annual Production 20,000
Tgal
Production Hrs. Annual 4,160
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,159,187 18,303,928
kWh
Natural Gas $97,488 21,250
MMBtu
Fuel Oil #6 $80,541 16,568
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $118,848 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,352

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.2113: Repair or replace steam traps $14,697 - - $14,697
-
MMBtu
02 2.7492: Use proper thickness of insulation on building envelope $655 $384 - $655
-
MMBtu
03 2.2437: Recover waste heat from equipment $103,496 $3,558 $6,696
93,494
kWh
$96,800
-
MMBtu
TOTAL RECOMMENDED $118,848 $3,942 $6,696
93,494
kWh
$112,152
-
MMBtu
TOTAL IMPLEMENTED $15,352 $384 - $15,352
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs