| Assessment Year | 2027 |
|---|---|
| Principal Product | Metal fabrication, coating, and blasting |
| NAICS | 332710: Machine Shops |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 77 |
| Plant Area |
85,000
ft2
|
| Annual Production | 60,800
pieces
|
| Production Hrs. Annual | 3,276
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $133,219 | 1,834,629 |
kWh
|
$0.073 |
| Electricity Demand | $160,820 | 9,350 |
kW-mo/yr
|
$17.20 |
| Electricity Fees | $51,217 | - |
|
- |
| TOTAL YEARLY COSTS | $345,256 | |||
| RECOMMENDED SAVINGS* | $4,127 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $729 | $249 |
$729
9,986
kWh
|
- | |
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $1,657 | - |
$1,657
22,694
kWh
|
- | |
| 03 | 2.7135: Install occupancy sensors | $491 | $1,707 |
$207
2,850
kWh
|
$284
-
kW-mo/yr
|
|
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $1,250 | $10,340 |
$451
6,182
kWh
|
$799
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $4,127 | $12,296 |
$3,044
41,712
kWh
|
$1,083
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs