ITAC Assessment: LT8458
ITAC logo
ITAC Assessment: LT8458
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2027
Principal Product Metal fabrication, coating, and blasting
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 77
Plant Area 85,000
ft2
Annual Production 60,800
pieces
Production Hrs. Annual 3,276
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,219 1,834,629
kWh
Electricity Demand $160,820 9,350
kW-mo/yr
Electricity Fees $51,217 -
TOTAL YEARLY COSTS $345,256
RECOMMENDED SAVINGS* $4,127 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $729 $249 $729
9,986
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $1,657 - $1,657
22,694
kWh
-
03 2.7135: Install occupancy sensors $491 $1,707 $207
2,850
kWh
$284
-
kW-mo/yr
04 2.7232: Replace existing hvac unit with high efficiency model $1,250 $10,340 $451
6,182
kWh
$799
-
kW-mo/yr
TOTAL RECOMMENDED $4,127 $12,296 $3,044
41,712
kWh
$1,083
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs