ITAC Assessment: LT8438
ITAC logo
ITAC Assessment: LT8438
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product General Medical and Surgical Services
NAICS 622110: General Medical and Surgical Hospitals
SIC 8062: General Medical and Surgical Hospitals
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 98,911
ft2
Annual Production 92,035
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $975,113 18,482,800
kWh
Electricity Demand $611,259 31,472
kW-mo/yr
Electricity Fees $39,229 -
Natural Gas $535,885 47,572
MMBtu
Other Gas $2,468 1
MMBtu
Waste Disposal Costs
Water Usage $77,091 42,635
Tgal
Water Disposal $107,911 42,635
Tgal
Other Liquid (non-haz) $36 1
gal
TOTAL YEARLY COSTS $2,348,991
RECOMMENDED SAVINGS* $13,326 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,203 $4,686 $1,136
21,430
kWh
$1,067
-
kW-mo/yr
-
02 2.7221: Lower temperature during the winter season and vice-versa $3,432 - $3,432
64,780
kWh
- -
03 2.2625: Chill water to the highest temperature possible $3,625 - $66
1,258
kWh
- $3,559
-
MMBtu
04 2.7135: Install occupancy sensors $4,066 $10,882 $1,989
37,534
kWh
$2,077
-
kW-mo/yr
-
TOTAL RECOMMENDED $13,326 $15,567 $6,623
125,002
kWh
$3,144
-
kW-mo/yr
$3,559
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs