Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Paper packaging and food wraps
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $50
M
to 100
M
# of Employees 175
Plant Area 147,000
ft2
Annual Production 912,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,368 4,026,600
kWh
Electricity Demand $95,764 8,364
kW-mo/yr
Waste Disposal Costs
Water Usage $1,718 238
Tgal
Water Disposal $5,203 238
Tgal
TOTAL YEARLY COSTS $345,054
RECOMMENDED SAVINGS* $98,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $832 $525 $832
13,827
kWh
- -
02 3.2172: Use automatic cleaning equipment $76,382 $353 $(-16,394.5)
(-36,504)
kWh
- $92,776
03 4.463: Modify facility to avoid excess maintenance costs $2,709 $870 - - $2,709
04 2.8114: Change rate schedules or other changes in utility service $1,538 - - - $1,538
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $17,419 $26,512 $(-18,032.4)
(-299,592)
kWh
$(-4,699.1)
-
kW-mo/yr
$40,150
TOTAL RECOMMENDED $98,880 $28,260 $(-33,594.7)
(-322,269)
kWh
$(-4,699.1)
-
kW-mo/yr
$137,173
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs