ITAC Assessment: LT8417
ITAC logo
ITAC Assessment: LT8417
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Rice Milling
NAICS 311212: Rice Milling
SIC 2044: Rice Milling
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area 33,768
ft2
Annual Production 87,600
ton
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,086 1,323,120
kWh
Electricity Demand $42,528 2,949
kW-mo/yr
Electricity Fees $6,546 -
TOTAL YEARLY COSTS $118,160
RECOMMENDED SAVINGS* $23,009 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $393 - $393
7,558
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,056 - $1,056
20,276
kWh
-
03 2.4131: Size electric motors for peak operating efficiency $18,894 $485,500 $14,215
269,217
kWh
$4,679
-
kW-mo/yr
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,666 $39,130 $1,894
36,289
kWh
$772
-
kW-mo/yr
TOTAL RECOMMENDED $23,009 $524,630 $17,558
333,340
kWh
$5,451
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs