ITAC Assessment: LT8416
ITAC logo
ITAC Assessment: LT8416
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Wooden building materials
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 16
Plant Area 63,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 2,210
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $7,969 39,350
kWh
Electricity Demand $264 237
kW-mo/yr
Fuel Oil #1 $50,108 1,754
MMBtu
Other Gas $468 1
MMBtu
Waste Disposal Costs
Water Usage $474 99
Tgal
Water Disposal $313 47
Tgal
TOTAL YEARLY COSTS $59,595
RECOMMENDED SAVINGS* $29,049 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $164 $118 $161
804
kWh
$5
-
kW-mo/yr
- - - $(-2.1)
02 2.7423: Reduce heat gain by window tinting $463 $400 $458
2,260
kWh
$5
-
kW-mo/yr
- - - -
03 4.514: Re-arrange equipment layout to reduce handling costs $28,423 $1,070 - - $89
-
MMBtu
$857 $27,476 -
TOTAL RECOMMENDED $29,049 $1,588 $619
3,065
kWh
$10
-
kW-mo/yr
$89
-
MMBtu
$857 $27,476 $(-2.1)
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs