ITAC Assessment: LT8400
ITAC logo
ITAC Assessment: LT8400
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Sweet potetos
NAICS 311991: Perishable Prepared Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 500,500
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 3,640
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,416 1,027,160
kWh
Electricity Demand $6,611 1,737
kW-mo/yr
Electricity Fees $3,911 -
TOTAL YEARLY COSTS $130,938
RECOMMENDED SAVINGS* $14,191 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,402 $6,697 $2,223
18,965
kWh
$179
-
kW-mo/yr
02 2.4322: Use or replace with energy efficient substitutes $749 $4,772 $651
5,558
kWh
$98
-
kW-mo/yr
03 2.9114: Use solar heat to make electricty $11,040 $26,888 $11,040
94,199
kWh
-
TOTAL RECOMMENDED $14,191 $38,357 $13,914
118,722
kWh
$277
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs