ITAC Assessment: LT8391
ITAC logo
ITAC Assessment: LT8391
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Premium cookie dough.
NAICS 311821: Cookie and Cracker Manufacturing
SIC 2052: Cookies and Crackers
Sales Range greater than $500
M
# of Employees 150
Plant Area 70,000
ft2
Annual Production 17
lb
Production Hrs. Annual 4,800
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $203,237 2,051,000
kWh
Electricity Demand $49,293 4,063
kW-mo/yr
Waste Disposal Costs
Water Usage $3,612 1,166
Tgal
Water Disposal $1,978 1,166
Tgal
TOTAL YEARLY COSTS $258,120
RECOMMENDED SAVINGS* $6,167 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,791 $4,000 $5,791
572,099
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $224 $2,775 $224
-
kWh
03 2.1321: Replace fossil fuel equipment with electrical equipment $153 $25,000 $153
-
kWh
TOTAL RECOMMENDED $6,167 $31,775 $6,167
572,099
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs