ITAC Assessment: LT8384
ITAC logo
ITAC Assessment: LT8384
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Lumber
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $100
M
to 500
M
# of Employees 180
Plant Area 4,660,488
ft2
Annual Production 240,000,000
units
Production Hrs. Annual 5,640
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,637,836 28,840,000
kWh
Electricity Demand $17,215 60,467
kW-mo/yr
Waste Disposal Costs
Water Usage $7,677 5,592
Tgal
Water Disposal $7,677 5,592
Tgal
TOTAL YEARLY COSTS $2,670,405
RECOMMENDED SAVINGS* $135,540 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Ancillary Material Cost Savings
01 4.652: Replace existing equipment with more suitable substitutes $52,627 $4,413 - $52,627
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,410 $35,947 $8,410
92,011
kWh
-
03 2.6218: Turn off equipment when not in use $68,891 $30 $68,891
757,047
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,612 $350 $5,612
61,404
kWh
-
TOTAL RECOMMENDED $135,540 $40,740 $82,913
910,462
kWh
$52,627
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs