ITAC Assessment: IA0126
ITAC logo
ITAC Assessment: IA0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product instrumentation equipment
NAICS
n/a
SIC 3491: Industrial Valves
Sales Range $10
M
to 50
M
# of Employees 276
Plant Area 204,000
ft2
Annual Production 2,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $385,238 6,985,639
kWh
Natural Gas $55,282 14,756
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,424 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,368

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4321: Upgrade obsolete equipment $43,805 $124,000 $43,805
341,149
kWh
-
02 2.7314: Reduce ventilation air $2,054 $975 $2,054
37,222
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,064 $25 $2,064
37,515
kWh
-
04 2.2437: Recover waste heat from equipment $886 $320 - $886
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $967 $2,222 $967
17,585
kWh
-
06 2.7135: Install occupancy sensors $1,238 $2,071 $1,238
22,567
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,106 $2,454 $2,106
38,101
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,304 $341 $1,304
23,740
kWh
-
TOTAL RECOMMENDED $54,424 $132,408 $53,538
517,879
kWh
$886
-
MMBtu
TOTAL IMPLEMENTED $49,368 $129,609 $49,368
442,263
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs