ITAC Assessment: LT8369
ITAC logo
ITAC Assessment: LT8369
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Frozen meat pie
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 25,450
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,508 1,310,694
kWh
Electricity Demand $83,284 5,566
kW-mo/yr
Electricity Fees $29,746 -
Natural Gas $30,567 2,061
MMBtu
Waste Disposal Costs
Water Usage $22,841 23,835
Tgal
TOTAL YEARLY COSTS $265,946
RECOMMENDED SAVINGS* $31,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $12,717 $30,030 $8,129
106,956
kWh
$4,588
-
kW-mo/yr
-
02 2.7232: Replace existing hvac unit with high efficiency model $14,592 $12,831 $11,493
151,219
kWh
$3,099
-
kW-mo/yr
-
03 2.2441: Preheat boiler makeup water with waste process heat $4,568 $3,852 - - $4,568
-
MMBtu
TOTAL RECOMMENDED $31,876 $46,713 $19,621
258,175
kWh
$7,687
-
kW-mo/yr
$4,568
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs