ITAC Assessment: LT8365
ITAC logo
ITAC Assessment: LT8365
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product paper machine rollers
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 32
Plant Area 312,000
ft2
Annual Production 240
units
Production Hrs. Annual 2,040
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,861 1,116,000
kWh
Electricity Demand $17,499 3,509
kW-mo/yr
LPG $8,196 323
MMBtu
Waste Disposal Costs
Water Usage $11,798 1,680
Tgal
Water Disposal $7,560 1,680
Tgal
TOTAL YEARLY COSTS $185,915
RECOMMENDED SAVINGS* $67,899 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,577 $1,300 $3,577
28,344
kWh
- - -
02 2.6218: Turn off equipment when not in use $55,888 - $57,688
457,115
kWh
- $(-1,800.0) -
03 2.1321: Replace fossil fuel equipment with electrical equipment $8,434 $216,000 $(-2,998.2)
(-23,758)
kWh
$8,196
-
MMBtu
- $3,236
TOTAL RECOMMENDED $67,899 $217,300 $58,267
461,702
kWh
$8,196
-
MMBtu
$(-1,800.0) $3,236
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs