| Assessment Year | 2022 |
|---|---|
| Principal Product | Bread products |
| NAICS | 311812: Commercial Bakeries |
| SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
| Sales Range | $100 M to 500M |
| # of Employees | 100 |
| Plant Area |
53,600
ft2
|
| Annual Production | 30,000,000
units
|
| Production Hrs. Annual | 7,500
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $436,000 | 5,004,300 |
kWh
|
$0.087 | |
| Electricity Demand | $124,619 | 8,801 |
kW-mo/yr
|
$14.16 | |
| Natural Gas | $27,810 | 2,189 |
MMBtu
|
$12.70 | |
| LPG | $620 | 20 |
MMBtu
|
$31.20 | |
| Waste Disposal Costs | |||||
| Water Usage | $12,102 | 3,998 |
Tgal
|
$3.03 | |
| Water Disposal | $21,335 | 3,998 |
Tgal
|
$5.34 | |
| TOTAL YEARLY COSTS | $622,486 | ||||
| RECOMMENDED SAVINGS* | $138,991 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $5,980 | $10,022 | - | - | $5,980 | - | - | - | |
| 02 | 4.632: Change operating conditions | $46,622 | - | - | - | - | - | $46,622 | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,542 | $2,945 |
$3,623
41,507
kWh
|
$20,919
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 3.1191: Change procedures / equipment / operating conditions | $14,468 | $15,975 | - | - | - | - | - | $14,468 | |
| 05 | 2.7425: Clean or color roof to reduce solar load | $22,308 | $32,500 |
$18,400
211,000
kWh
|
$3,908
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 2.2441: Preheat boiler makeup water with waste process heat | $23,817 | $51,385 | - | - | - |
$23,817
-
MMBtu
|
- | - | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,254 | - |
$1,016
11,633
kWh
|
$238
-
kW-mo/yr
|
- | - | - | - | |
| TOTAL RECOMMENDED | $138,991 | $112,827 |
$23,039
264,141
kWh
|
$25,065
-
kW-mo/yr
|
$5,980 |
$23,817
-
MMBtu
|
$46,622 | $14,468 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs