ITAC Assessment: LT0134
ITAC logo
ITAC Assessment: LT0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product RUBBER ROLL COVERINGS
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 32
Plant Area
n/a
Annual Production 350,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,398 1,354,045
kWh
Natural Gas $28,993 6,752
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,247 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,235

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1131: Repair faulty insulation in furnaces, boilers, etc $124 $200 - $124
-
MMBtu
-
02 2.6218: Turn off equipment when not in use $1,336 - $1,336
33,411
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $564 - $564
14,068
kWh
- -
04 2.4133: Use most efficient type of electric motors $608 $1,188 $608
12,896
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,164 - $1,164
23,740
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $280 $109 $311
6,448
kWh
- $(-31.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $171 $372 $102
2,638
kWh
- $69
TOTAL RECOMMENDED $4,247 $1,869 $4,085
93,201
kWh
$124
-
MMBtu
$38
TOTAL IMPLEMENTED $3,235 $372 $3,166
73,857
kWh
- $69
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs