ITAC Assessment: LT0133
ITAC logo
ITAC Assessment: LT0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MOLDED WOODEN PLUGS
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $500
k
to 1
M
# of Employees 25
Plant Area
n/a
Annual Production 412
ton
Production Hrs. Annual 6,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,210 501,172
kWh
Natural Gas $7,863 1,419
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,130 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,707

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,390 - $1,390
27,843
kWh
- -
02 2.4133: Use most efficient type of electric motors $343 $507 $343
5,862
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $423 - $423
6,741
kWh
- -
04 2.7231: Use radiant heater for spot heating $1,760 $1,860 - $1,760
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $214 $66 $232
3,810
kWh
- $(-18.0)
TOTAL RECOMMENDED $4,130 $2,433 $2,388
44,256
kWh
$1,760
-
MMBtu
$(-18.0)
TOTAL IMPLEMENTED $3,707 $2,433 $1,965
37,515
kWh
$1,760
-
MMBtu
$(-18.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs