ITAC Assessment: LT0131
ITAC logo
ITAC Assessment: LT0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PAPERROLL PLUGS
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 22
Plant Area
n/a
Annual Production 17,000,000
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,217 941,090
kWh
Natural Gas $2,878 475
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,097

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $800 $2,400 - $800
-
MMBtu
02 2.5194: Redesign process $21,900 $20,130 $21,900
326,495
kWh
-
03 2.4131: Size electric motors for peak operating efficiency $930 $1,760 $930
9,086
kWh
-
04 2.4133: Use most efficient type of electric motors $138 $362 $138
2,052
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $284 - $284
3,224
kWh
-
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $860 $100 $860
11,723
kWh
-
08 2.7111: Reduce illumination to minimum necessary levels $85 - $85
1,465
kWh
-
TOTAL RECOMMENDED $24,997 $24,752 $24,197
354,045
kWh
$800
-
MMBtu
TOTAL IMPLEMENTED $3,097 $4,622 $2,297
27,550
kWh
$800
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs